Thakurgaon Sadar
Work location in the source: Thakurgaon Sadar
Reported financial progress: ৳18,319,000 · 30 June 2026
100% · 26 July 2026
Payment and present condition remain separate questions.
Begrot and Police Line road improvements · Questions, observations & replies
Loading source developments…
Each step is a separate stage; amounts are never added together.
Estimate or approved cost
Record not obtainedFunds released
Record not obtained · unknown is not zero
Contract
৳1.84 croreAwarded contract · ৳18,445,181.667 · 25 March 2020Award detail where available; listing-only amounts are approximate. This is not a payment.
Spending in a report
৳1.83 croreReported financial progress · ৳18,319,000 · 30 June 2026A dated source report, not an independent inspection, acceptance or executed-payment record.
Certified bill
Record not obtained · unknown is not zero
Payment made
Record not obtained · unknown is not zero
The list of what each part of this work costs (an estimate or BOQ) has not been obtained. It cannot be worked out from the contract total.
APP expected contract signing
PlannedIFT tentative start
PlannedContract signed
Contract recordSource commencement date
Source reportAward proposed start
PlannedCertificate-reported start
Certificate claimAPP expected contract completion
PlannedIFT tentative completion
PlannedCertificate reports Completed
Certificate claimSource completion date
Source reportCertificate-reported end
Certificate claimAward proposed completion
PlannedProgress report: 100% work
Source reportReport remark: Final BillToday
A date in a report or certificate is not an inspection.
The name is in the full account below. Contracts under the same personal name are not grouped.
For safety, keep faces, house numbers and phone numbers out of photos and posts.
Every figure, date and document with its source. Open a topic to check it.
Separate financial stages · never added together
A dated source report, not an independent inspection, acceptance or executed-payment record.
Award detail where available; listing-only amounts are approximate. This is not a payment.
FY 2019–20 procurement-planning estimate. It is separate from the later LGED estimate, contract award and reported financial progress; never add them.
Payment ledger incompleteCash balance unknown
Unknown payments are not zero. Differences between financial stages do not establish unspent or missing money. A comparable ledger and reconciliation are needed for a balance.
APP expected contract signing Planned
Expected date in the procurement plan, not proof of signing or actual completion.IFT tentative start Planned
Tentative dates in the invitation, preceding the later proposed award dates. Neither field alone establishes actual start or delay.Source commencement date Source reported
A source-reported schedule or quantity; this does not establish independent acceptance, payment or current condition.Report date: 30 June 2026Award proposed start Planned
A proposed date in the public award, not an independently established actual work date. Read it alongside the IFT, signed instrument and historical experience record.Certificate-reported start Certificate claim
Source-reported work experience, not independent acceptance or an executed-payment ledger.APP expected contract completion Planned
Expected date in the procurement plan, not proof of signing or actual completion.IFT tentative completion Planned
Tentative dates in the invitation, preceding the later proposed award dates. Neither field alone establishes actual start or delay.Source completion date Source reported
The source does not establish whether this is planned, revised or actual completion.Report date: 26 July 2026Source completion date Source reported
A source-reported schedule or quantity; this does not establish independent acceptance, payment or current condition.Report date: 30 June 2026Certificate-reported end Certificate claim
Source-reported work experience, not independent acceptance or an executed-payment ledger.Award proposed completion Planned
A proposed date in the public award, not an independently established actual work date. Read it alongside the IFT, signed instrument and historical experience record.A completed date field or certificate claim does not establish independent acceptance. An actual start or completion date is only identified when the source establishes it.
29 March 2021 · This is a retained certificate claim. Its date is the reported work date, not a verified inspection or necessarily the certificate issue date.
26 July 2026 · A dated source report, not an independent inspection, acceptance or executed-payment record.
26 July 2026 · A dated source report, not an independent inspection, acceptance or executed-payment record.
30 June 2026 · A dated source report, not an independent inspection, acceptance or executed-payment record.
30 June 2026 · A dated source report, not an independent inspection, acceptance or executed-payment record.
30 June 2026 · Retained separately from the reported amount; conflicting fields need explanation.
30 June 2026 · A source-reported schedule or quantity; this does not establish independent acceptance, payment or current condition.
29 March 2021 · Source-reported work experience, not independent acceptance or an executed-payment ledger.
27 April 2021 · Reported percentage only. Do not multiply by award to manufacture a paid amount.
Date not established · Documentary work location, not a field inspection or verification of present condition.
Date not established · Scope as described in the award; it is not a signed measurement-book quantity or itemized BOQ.
Date not established · The public IFT and award print APP 159205 and the same package. This planned length is not measured/accepted work; the lot and package estimates describe the same scope.
Independent acceptance and the present condition are not established here. A dated resident observation appears in the conversation as a citizen account.
The public award explicitly declares Sadar, Thakurgaon as the work location. This account covers only the named road package; planned scope and historical reported progress are not independent verification of current delivery.
Location is recorded in the source; current conditions have not been independently inspected.
1 Improvement of Begrot GPS to Bonkoki Jhatibhanga pucca road via Pathanpara & Pathrraj River Road at ch. 3253m to 4753m Road ID No. 194944203 2 Improvement of Thakurgaon Police line to Valukai Road at ch. 685m to 1685m under Sadar Upazila Dist.Thakurgaon.Road ID No. 194944085 SADAR
Planned quantities are separate from measured or accepted work.
Counts as printed in the procurement source. These counts alone do not establish misconduct.
These are questions to check. Missing records, money differences and reported completion do not establish corruption.
Some answers are shown here, and some held documents still need further extraction or review. Other records need a request to the holding office. The labels distinguish these situations; missing online does not mean unobtainable.
Office holding all of these: LGED Thakurgaon Executive Engineer; Sadar supervising engineer; LGED/project accounts
The exact APP plans 2,500 metres across two roads. The linked tender-document route requires registered-user access; the full priced BOQ was not inspected.
Read the source date and scope with this finding. A retrieved summary is not the underlying signed account.
The named office is a collection route; custody, existence and disclosure of each missing file require confirmation. Missing records do not establish wrongdoing.
This is an observed access condition, not proof that an office copy is unavailable.
The award proposes 1 April 2020–30 March 2021; the certificate reports 6 April 2020–29 March 2021. These dates describe different stages.
Read the source date and scope with this finding. A retrieved summary is not the underlying signed account.
The named office is a collection route; custody, existence and disclosure of each missing file require confirmation. Missing records do not establish wrongdoing.
Historical progress and a certificate are held. A chainage conflict and the absence of measurement-book pages prevent quantity reconciliation.
Read the source date and scope with this finding. A retrieved summary is not the underlying signed account.
The named office is a collection route; custody, existence and disclosure of each missing file require confirmation. Missing records do not establish wrongdoing.
A historical Final Bill remark does not supply the signed final bill, deductions or retention account.
Read the source date and scope with this finding. A retrieved summary is not the underlying signed account.
The named office is a collection route; custody, existence and disclosure of each missing file require confirmation. Missing records do not establish wrongdoing.
The financial-progress figure is held, but no bill-to-payee settlement ledger was obtained.
Read the source date and scope with this finding. A retrieved summary is not the underlying signed account.
The named office is a collection route; custody, existence and disclosure of each missing file require confirmation. Missing records do not establish wrongdoing.
Exact identifiers and possible matches remain distinct, and a programme total is not this work’s share.
Planned purchases and quantities. A plan does not prove an award, delivery or payment.
একই APP ও প্যাকেজের ক্রয় পরিকল্পনা
Identifier matchedplan-173601
Exact compound match: public IFT and award print APP 159205 and package RDRIIP-2 /W-VRA-273; APP package 428062 carries the same package and both road IDs. Planning and execution amounts remain separate.
Original documents · open a page to check the claim
…