Business selected
Rehabilitation (Uniblock) of Horipur Govt. Pry. School-Beurjhary hat via Koruamaldaghpara Road from Ch. 3020m -6360m. [Road ID: 194084029] under Baliadangi upazila district Thakurgaon
Office of the Executive Engineer, LGED, Thakurgaon
Associated through the purchasing office; the work location is not established by this alone.
contract-89390 · 2026-02-05
The work. The money. The unanswered questions.
Find a work, institution or place. Read the records we hold, see what is still missing, and ask the next question.
These are different views of the evidence. A programme, its contracts and a place may overlap; the counts are not a total of distinct projects.
Work records in the collection
Matching records: 17,659 · Page 65. Each opens the evidence held for that record. Most have not had an individual document-availability review.
Tyres Tube Purchase
Deputy Director (SP), BADC, Thakurgaon
Associated through the purchasing office; the work location is not established by this alone.
plan-876754 · 2026-02-05Open dates, money and source factsRepair works including installation of Alluminium sliding door, Swing door, Glass door in Surgery ward and Cabin block of 250 bed General Hospital, Thakurgaon.
Thakurgaon PWD Division
Associated through the purchasing office; the work location is not established by this alone.
contract-90010 · 2026-02-05Open dates, money and source factsRepair works including Installation of Alluminium sliding door, Swing door at Medicine Ward of 250 Bed General Hospital, Thakurgaon.
Thakurgaon PWD Division
Associated through the purchasing office; the work location is not established by this alone.
contract-89998 · 2026-02-05Open dates, money and source factsSupply of bedding items for District Model Mosque and Islamic Cultural Centre, Thakurgaon under the project of establishment of 560 Model Mosque and Islamic Cultural Centre in each District and Upazila ( 2nd revised).
Thakurgaon PWD Division
Associated through the purchasing office; the work location is not established by this alone.
contract-89984 · 2026-02-05Open dates, money and source factsSupply of bedding items for Ranisankail Upazila Model Mosque and Islamic Cultural Centre, Thakurgaon under the project of establishment of 560 Model Mosque and Islamic Cultural Centre in each District and Upazila ( 2nd revised).
Thakurgaon PWD Division
Associated through the purchasing office; the work location is not established by this alone.
contract-89973 · 2026-02-05Open dates, money and source factsSupply of bedding items for Pirganj Upazila Model Mosque and Islamic Cultural Centre, Thakurgaon under the project of establishment of 560 Model Mosque and Islamic Cultural Centre in each District and Upazila ( 2nd revised).
Thakurgaon PWD Division
Associated through the purchasing office; the work location is not established by this alone.
contract-89966 · 2026-02-05Open dates, money and source factsSupply of bedding items for Baliadangi Upazila Model Mosque and Islamic Cultural Centre, Thakurgaon under the project of establishment of 560 Model Mosque and Islamic Cultural Centre in each District and Upazila ( 2nd revised).
Thakurgaon PWD Division
Associated through the purchasing office; the work location is not established by this alone.
contract-89950 · 2026-02-05Open dates, money and source factsSupply of bedding items for Horipur Upazila Model Mosque and Islamic Cultural Centre, Thakurgaon under the project of establishment of 560 Model Mosque and Islamic Cultural Centre in each District and Upazila ( 2nd revised).
Thakurgaon PWD Division
Associated through the purchasing office; the work location is not established by this alone.
contract-89943 · 2026-02-05Open dates, money and source factsCleaning works at 250 bed General Hospital, Thakurgaon.
Thakurgaon PWD Division
Associated through the purchasing office; the work location is not established by this alone.
contract-89666 · 2026-02-05Open dates, money and source factsRehabilitation (Uniblock) of Horipur Govt. Pry. School-Beurjhary hat via Koruamaldaghpara Road from Ch. 3020m -6360m. [Road ID: 194084029] under Baliadangi upazila district Thakurgaon
Office of the Executive Engineer, LGED, Thakurgaon
Associated through the purchasing office; the work location is not established by this alone.
contract-89390 · 2026-02-05Open dates, money and source factsHessian New Gunnies with 30 kg packing capacity manufactured in the year 2026 or latest. 1. Bag Length: 86.36cm/34 inch, Tolerance: +4cm -0; 2. Bag width: 45.72cm/18 inch, Tolerance: +4cm -0; 3. Bag weight: 330gm/0.73 Pound, Tolerance: +6 percent, -2 percent; 4. Ex-Cloth: 36inch-10.8 oz/36inch (11x12) {WIP (Weight in proportion) 40 inch-12 oz/36 inch (11x12)}; 5. Porter (Ends/dm): 11(47), Tolerance: +2, -2; 6. Shots/Ins (Picks/dm): 12(47), Tolerance: +2, -2; 7. Moisture Regain (MR Percent): Contract 16 percent, Maximum 17 percent; 8. Oil Content: 3 percent Maximum, 9. Sewn: Hemmed Mouth, Herackle Sewn (HKL) Side & Bottom+Safety Sewn; 10. Stitch/dm: Hemming 9-11, Herackle 9-11 & Safety Sewn 9-11; 11. Seam Yarn Count: Hemming 9 lbs 1 Ply, Herackle 9 lbs 3 Ply & Safety 9 lbs 2 Ply; 12. Strength (Kg): a. Cloth breaking load (Strip method 10x20cm): Warp Way- 112 kg (minimum), Weft Way- 120 kg (minimum), b. Seam breaking load (Strip method 5x20cm): Warp Way- 34 kg (minimum), Weft Way- 36 kg (minimum); 13. No. of Bag per Bundle: 25 Pcs, Tolerance: +0, -0; 14. No. of Bundle per Bale: 12 Bundle, Tolerance: +0, -0; 15. No. of Bag per Bale: 300 Pcs, Tolerance: +0, -0; 16. Bale Weight: Net Weight=99 kg, Tolerance: +Acceptable,-0, Tare Weight=3kg, Gross Weight =102 kg; 17. Bale Packing: Flat Packing, Bags Wrap in Clean Jute Cloth and Binded with 2(Two) Iron Belt.PIRGANJ LSD, THAKURGAON-1,50,000, BALIADANGI LSD, THAKURGAON-1,00,000 PCS.).
Office of the Director Procurement
A source mention does not establish local delivery.
plan-600972 · 2026-02-04Open dates, money and source factsHessian New Gunnies with 30 kg packing capacity manufactured in the year 2026 or latest. 1. Bag Length: 86.36cm/34 inch, Tolerance: +4cm -0; 2. Bag width: 45.72cm/18 inch, Tolerance: +4cm -0; 3. Bag weight: 330gm/0.73 Pound, Tolerance: +6 percent, -2 percent; 4. Ex-Cloth: 36inch-10.8 oz/36inch (11x12) {WIP (Weight in proportion) 40 inch-12 oz/36 inch (11x12)}; 5. Porter (Ends/dm): 11(47), Tolerance: +2, -2; 6. Shots/Ins (Picks/dm): 12(47), Tolerance: +2, -2; 7. Moisture Regain (MR Percent): Contract 16 percent, Maximum 17 percent; 8. Oil Content: 3 percent Maximum, 9. Sewn: Hemmed Mouth, Herackle Sewn (HKL) Side & Bottom+Safety Sewn; 10. Stitch/dm: Hemming 9-11, Herackle 9-11 & Safety Sewn 9-11; 11. Seam Yarn Count: Hemming 9 lbs 1 Ply, Herackle 9 lbs 3 Ply & Safety 9 lbs 2 Ply; 12. Strength (Kg): a. Cloth breaking load (Strip method 10x20cm): Warp Way- 112 kg (minimum), Weft Way- 120 kg (minimum), b. Seam breaking load (Strip method 5x20cm): Warp Way- 34 kg (minimum), Weft Way- 36 kg (minimum); 13. No. of Bag per Bundle: 25 Pcs, Tolerance: +0, -0; 14. No. of Bundle per Bale: 12 Bundle, Tolerance: +0, -0; 15. No. of Bag per Bale: 300 Pcs, Tolerance: +0, -0; 16. Bale Weight: Net Weight=99 kg, Tolerance: +Acceptable,-0, Tare Weight=3kg, Gross Weight =102 kg; 17. Bale Packing: Flat Packing, Bags Wrap in Clean Jute Cloth and Binded with 2(Two) Iron Belt.(RUHIA LSD, THAKURGAON-1,50,000, DEBIGANJ LSD, PANCHAGARH-1,00,000 PCS.).
Office of the Director Procurement
A source mention does not establish local delivery.
plan-600971 · 2026-02-04Open dates, money and source factsHessian New Gunnies with 30 kg packing capacity manufactured in the year 2026 or latest. 1. Bag Length: 86.36cm/34 inch, Tolerance: +4cm -0; 2. Bag width: 45.72cm/18 inch, Tolerance: +4cm -0; 3. Bag weight: 330gm/0.73 Pound, Tolerance: +6 percent, -2 percent; 4. Ex-Cloth: 36inch-10.8 oz/36inch (11x12) {WIP (Weight in proportion) 40 inch-12 oz/36 inch (11x12)}; 5. Porter (Ends/dm): 11(47), Tolerance: +2, -2; 6. Shots/Ins (Picks/dm): 12(47), Tolerance: +2, -2; 7. Moisture Regain (MR Percent): Contract 16 percent, Maximum 17 percent; 8. Oil Content: 3 percent Maximum, 9. Sewn: Hemmed Mouth, Herackle Sewn (HKL) Side & Bottom+Safety Sewn; 10. Stitch/dm: Hemming 9-11, Herackle 9-11 & Safety Sewn 9-11; 11. Seam Yarn Count: Hemming 9 lbs 1 Ply, Herackle 9 lbs 3 Ply & Safety 9 lbs 2 Ply; 12. Strength (Kg): a. Cloth breaking load (Strip method 10x20cm): Warp Way- 112 kg (minimum), Weft Way- 120 kg (minimum), b. Seam breaking load (Strip method 5x20cm): Warp Way- 34 kg (minimum), Weft Way- 36 kg (minimum); 13. No. of Bag per Bundle: 25 Pcs, Tolerance: +0, -0; 14. No. of Bundle per Bale: 12 Bundle, Tolerance: +0, -0; 15. No. of Bag per Bale: 300 Pcs, Tolerance: +0, -0; 16. Bale Weight: Net Weight=99 kg, Tolerance: +Acceptable,-0, Tare Weight=3kg, Gross Weight =102 kg; 17. Bale Packing: Flat Packing, Bags Wrap in Clean Jute Cloth and Binded with 2(Two) Iron Belt.(THAKURGAON SADAR LSD, THAKURGAON-2,50,000 PCS.).
Office of the Director Procurement
A source mention does not establish local delivery.
plan-600970 · 2026-02-04Open dates, money and source factsRepair and Maintenance of BWDB DCEO Office Washroom Work
Bangladesh Water Development Board (BWDB)
Associated through the purchasing office; the work location is not established by this alone.
tender-1222110 · 2026-02-03Open dates, money and source factsRepair and Maintenance of BWDB DCEO Office 4 Door and 8 Windows
Bangladesh Water Development Board (BWDB)
Associated through the purchasing office; the work location is not established by this alone.
tender-1222108 · 2026-02-03Open dates, money and source factsRepair and maintanence of Extension office and AEO Office BWDB Dinajpur
Bangladesh Water Development Board (BWDB)
Associated through the purchasing office; the work location is not established by this alone.
tender-1222106 · 2026-02-03Open dates, money and source factsRepair and Maintanence of Tiles Work of DCEO Office Thakurgaon
Bangladesh Water Development Board (BWDB)
Associated through the purchasing office; the work location is not established by this alone.
tender-1222094 · 2026-02-03Open dates, money and source factsBank Protection work along the Right Bank of Karatoa river from KM. 69.140 to KM. 70.040 = 900 m at Baropatia in Upazila: Boda, District: Panchagarh.
Panchgarh WD Division
A source mention does not establish local delivery.
plan-889152 · 2026-02-03Open dates, money and source factsBank Protection work along the Right Bank of Karatoa river from KM. 51.870 to KM.53.020 = 1150m at Sonachandi in Upazila: Boda, District: Panchagarh.
Panchgarh WD Division
A source mention does not establish local delivery.
plan-889151 · 2026-02-03Open dates, money and source factsBank Protection work along the Left Bank of Karotoa River at Mithapukur (Ramerdanga) in between Km. 39.950 to Km. 41.260 = 1300m in Upazila- Panchagarh Sadar, District- Panchagarh.
Panchgarh WD Division
A source mention does not establish local delivery.
plan-889150 · 2026-02-03Open dates, money and source factsBank Protection Work on Right Bank of Tangon River at College Para area from km. 27.260 to Km. 27.856 = 596 m in Upazila-Thakurgaon Sadar, District-Thakurgaon
Thakurgaon WD Division
Associated through the purchasing office; the work location is not established by this alone.
plan-889092 · 2026-02-03Open dates, money and source factsBank Protection Work on Right Bank of Tangon River at College Para area from km. 26.290 to Km. 26.955 = 665 m in Upazila-Thakurgaon Sadar, District-Thakurgaon
Thakurgaon WD Division
Associated through the purchasing office; the work location is not established by this alone.
plan-889091 · 2026-02-03Open dates, money and source factsBank Protection Work on Left Bank of Tangon River at Gobindanagar area from km. 25.864 to Km. 27.464 = 1600 m in Upazila-Thakurgaon Sadar, District-Thakurgaon
Thakurgaon WD Division
Associated through the purchasing office; the work location is not established by this alone.
plan-889090 · 2026-02-03Open dates, money and source factsBank Protection Work on Right Bank of Kulic River at Shoshan Kalimondir area from km. 26.720 to Km. 26.895 = 175.00 m in Upazila-Ranisankoil, District-Thakurgaon.
Thakurgaon WD Division
Associated through the purchasing office; the work location is not established by this alone.
plan-889089 · 2026-02-03Open dates, money and source facts