কাজের হিসাব খুলছে…
কাজের হিসাব খুলছে…
Thakurgaon Sadar
Linked through an office; work location is not verified.
Money stage unknown
Evidence needed · Delivery date unknown
Payment and present condition remain separate questions.
Construction of 250mm dia 590 meter length uPVC Buried pipe line extension · Questions, observations & replies
Loading source developments…
Each step is a separate stage; amounts are never added together.
Estimate or approved cost
Record not obtainedFunds released
This record does not cover this stage
Contract
This record does not cover this stage
Spending in a report
This record does not cover this stage
Certified bill
This record does not cover this stage
Payment made
This record does not cover this stage
The list of what each part of this work costs (an estimate or BOQ) has not been obtained. It cannot be worked out from the contract total.
Notice published
Source reportBidding closes
PlannedToday
A date in a report or certificate is not an inspection.
For safety, keep faces, house numbers and phone numbers out of photos and posts.
Every figure, date and document with its source. Open a topic to check it.
Separate financial stages · never added together
No sourced amount is established for this record.
Payment ledger incompleteCash balance unknown
Unknown payments are not zero. Differences between financial stages do not establish unspent or missing money. A comparable ledger and reconciliation are needed for a balance.
Notice published Source reported
A dated source report, not an independent inspection, acceptance or executed-payment record.Bidding closes Planned
A planned date, not proof the event occurred.A completed date field or certificate claim does not establish independent acceptance. An actual start or completion date is only identified when the source establishes it.
A contract amount alone does not show how much work was delivered.
Independent acceptance and the present condition are not established here. A dated resident observation appears in the conversation as a citizen account.
Only this record’s scope. Related plans, contracts and programme budgets cannot be added together. Associated through the procuring office; local delivery and district share are not verified.
The purchasing office connects this record to Thakurgaon; the work location must be read from its scope.
Construction of 250mm dia 590 meter length uPVC Buried pipe line extension
Planned quantities are separate from measured or accepted work.
These are questions to check. Missing records, money differences and reported completion do not establish corruption.
The work’s current stage and document availability have not yet been reviewed. A plan or tender record does not establish that work took place or that a final bill is due. The records below still need checks for applicability and a collection route.
Office holding all of these: Barind Multipurpose Development Authority (BMDA)
A title and total price do not establish quantities, specifications or unit rates.
Signing, planned dates and source-reported dates have different meanings.
A progress percentage or completion claim is not itemized accepted work.
A Final Bill remark does not supply the signed bill, retention, tax or adjustments.
Reported expenditure does not identify every executed transaction or a current balance.
Exact identifiers and possible matches remain distinct, and a programme total is not this work’s share.
Contract amounts belong to their own packages. They are not additional project spending.
Construction of 250mm dia 590 meter length uPVC Buried pipe line extension
Identifier matchedcontract-293271
Exact tender ID
Read each connection’s basis and scope before comparing amounts.
Identifier matchedprogramme-224331300
Exact project code; programme cost is not a local share
Original documents · open a page to check the claim
…