Whole programme; the Thakurgaon share is not established.
Reported expenditure: ৳482,872,000 · 30 June 2025
Evidence needed · Delivery date unknown
Payment and present condition remain separate questions.
Programme 224351000 · Questions, observations & replies
Loading source developments…
Planned estimate · not spending or paymentWhole programme; the Thakurgaon share is not established.
Same full project title; no printed project-code match.
The same name, quantity and amount are also in the 2025-2026 plan. It may be the same work planned again; do not add the two.
Procurement plan for FY 2024-2025; APP 204813, package 1078286, PKG/DEV/Thakurgaon/EGP-02/2024-25; retained 28 July 2026.
Bar length compares each row with the largest row in this list. It is not a share or percentage of any total.
The amount is the entire planned lot estimate, not a unit rate, award or payment. Versions/retenders may overlap; do not sum repeated work. Source unit is retained literally.
The source gives no unit rates; none has been worked out by dividing a total.
Each row is as the source gives it. Rows are not added into a total.
Each step is a separate stage; amounts are never added together.
Estimate or approved cost
৳116.73 croreApproved project cost · ৳1,167,301,000 · Date not known · whole projectThese are whole-programme figures, not Thakurgaon allocations, releases, paid bills or available cash. Spending through June 2025 cannot be subtracted from the 2026–27 allocation to calculate a remaining balance.
Allocation
৳20.6 croreAnnual allocation · ৳206,000,000 · Date not known · 2026-27These are whole-programme figures, not Thakurgaon allocations, releases, paid bills or available cash. Spending through June 2025 cannot be subtracted from the 2026–27 allocation to calculate a remaining balance.
Funds released
Record not obtained · unknown is not zero
Contract
Record not obtainedSpending in a report
৳48.29 croreReported expenditure · ৳482,872,000 · 30 June 2025 · through 2025-06-30These are whole-programme figures, not Thakurgaon allocations, releases, paid bills or available cash. Spending through June 2025 cannot be subtracted from the 2026–27 allocation to calculate a remaining balance.
Certified bill
Record not obtained · unknown is not zero
Payment made
Record not obtained · unknown is not zero
Admin-building contract signed
Contract recordToday
A date in a report or certificate is not an inspection.
For safety, keep faces, house numbers and phone numbers out of photos and posts.
Every figure, date and document with its source. Open a topic to check it.
Separate financial stages · never added together
These are whole-programme figures, not Thakurgaon allocations, releases, paid bills or available cash. Spending through June 2025 cannot be subtracted from the 2026–27 allocation to calculate a remaining balance.
Same limits as Reported expenditure above.
Same limits as Reported expenditure above.
Same limits as Reported expenditure above.
FY2026–27 whole-project allocation category, not expenditure, release or payment. Revenue and capital are components of the already displayed annual allocation, not additional money.
Same limits as FY2026–27 revenue allocation above.
Award commitment for this administrative-building package only, not whole-project spending, an executed payment, a complete signed contract bundle or verified worksite. The public notice supplies the exact project code through tender 1313930.
Payment ledger incompleteCash balance unknown
Unknown payments are not zero. Differences between financial stages do not establish unspent or missing money. A comparable ledger and reconciliation are needed for a balance.
These are whole-programme figures, not Thakurgaon allocations, releases, paid bills or available cash. Spending through June 2025 cannot be subtracted from the 2026–27 allocation to calculate a remaining balance.
The book marks this project with an asterisk: funds may not be released or spent without extending its implementation period. Any later extension is not established here.
Read the ADP source · PDF page 106 (printed 74)Project code 224351000 · Row 9 · Total row
Admin-building contract signed Contract record
Award commitment for this administrative-building package only, not whole-project spending, an executed payment, a complete signed contract bundle or verified worksite. The public notice supplies the exact project code through tender 1313930.Report date: 4 October 2026A completed date field or certificate claim does not establish independent acceptance. An actual start or completion date is only identified when the source establishes it.
1 October 2026 · A retained procurement notice, separate from the existing awarded contracts and annual project allocation.
1 October 2026 · A retained procurement notice, separate from the existing awarded contracts and annual project allocation.
Independent acceptance and the present condition are not established here. A dated resident observation appears in the conversation as a citizen account.
These are whole-programme figures, not Thakurgaon allocations, releases, paid bills or available cash. Spending through June 2025 cannot be subtracted from the 2026–27 allocation to calculate a remaining balance.
These figures cover the whole programme. They are not a Thakurgaon allocation or expenditure total.
বিসিক খাদ্য প্রক্রিয়াজাতকরণ শিল্পনগরী, ঠাকুরগাঁও (১ম সংশোধিত)
Planned quantities are separate from measured or accepted work.
These are questions to check. Missing records, money differences and reported completion do not establish corruption.
The work’s current stage and document availability have not yet been reviewed. A plan or tender record does not establish that work took place or that a final bill is due. The records below still need checks for applicability and a collection route.
Office holding all of these: Programme context
A title and total price do not establish quantities, specifications or unit rates.
Signing, planned dates and source-reported dates have different meanings.
A progress percentage or completion claim is not itemized accepted work.
A Final Bill remark does not supply the signed bill, retention, tax or adjustments.
Reported expenditure does not identify every executed transaction or a current balance.
Exact identifiers and possible matches remain distinct, and a programme total is not this work’s share.
Contract amounts belong to their own packages. They are not additional project spending.
Identifier matchedcontract-130455
Exact reported project code; not a local budget split
Identifier matchedcontract-81020
Exact reported project code; not a local budget split
Construction of Industrial Boundary Gate 04-Aug-2026 14:10
Identifier matchedcontract-2692506
Exact reported project code; not a local budget split
Admin building — Noor Hossain Limited
Identifier matchedcontract-2700351
Exact tender 1313930 in held award detail and public notice; notice prints project code 224351000. Package-lot 2083235. This joins award identity, not actual payment or worksite verification.
Planned purchases and quantities. A plan does not prove an award, delivery or payment.
Construction of Office/Admin Building
Possible match · needs reviewplan-711513
The APP row prints the same full project title; APP 217695, package 1239472, source grain Package. No project code is printed in this retained plan row. This is project context, not a proved plan-to-contract join or verified delivery location. Planning estimates, awards and expenditure are not added.
Possible match · needs reviewplan-711515
The APP row prints the same full project title; APP 217695, package 1239505, source grain Package. No project code is printed in this retained plan row. This is project context, not a proved plan-to-contract join or verified delivery location. Planning estimates, awards and expenditure are not added.
Possible match · needs reviewplan-711516
The APP row prints the same full project title; APP 217695, package 1239523, source grain Package. No project code is printed in this retained plan row. This is project context, not a proved plan-to-contract join or verified delivery location. Planning estimates, awards and expenditure are not added.
Possible match · needs reviewplan-1529838
The APP row prints the same full project title; APP 204813, package 1077769, source grain Package. No project code is printed in this retained plan row. This is project context, not a proved plan-to-contract join or verified delivery location. Planning estimates, awards and expenditure are not added.
Possible match · needs reviewplan-1529839
The APP row prints the same full project title; APP 204813, package 1078286, source grain Package. No project code is printed in this retained plan row. This is project context, not a proved plan-to-contract join or verified delivery location. Planning estimates, awards and expenditure are not added.
Possible match · needs reviewplan-1907938
The APP row prints the same full project title; APP 227888, package 1416125, source grain Package. No project code is printed in this retained plan row. This is project context, not a proved plan-to-contract join or verified delivery location. Planning estimates, awards and expenditure are not added.
Construction RCC Drain of Industrial Estate
Possible match · needs reviewplan-1907939
The APP row prints the same full project title; APP 227888, package 1416133, source grain Package. No project code is printed in this retained plan row. This is project context, not a proved plan-to-contract join or verified delivery location. Planning estimates, awards and expenditure are not added.
Published procurement notices; any later award has its own evidence.
Construction of RCC Drain and culvert
Identifier matchedtender-1321867
Retained notice prints exact project code 224351000 and APP 227888. Notice is not an award or payment.
Identifier matchedtender-1321868
Retained notice prints exact project code 224351000 and APP 227888. Notice is not an award or payment.
Read each connection’s basis and scope before comparing amounts.
Same project code in another retained record
Identifier matchedproject-224351000
Exact project code; versions and amounts are not additive
Original documents · open a page to check the claim
…