কাজের হিসাব খুলছে…

Construction of (1) Gate at Purbo Boguladangi Idgaon Minar Gate, at Balia Union, (2) Boundary Wall at M.C.S.C High School (103m) at Balia UP, (3) Boundary Wall at Khalisakuri Boro Balia Durga Mondir (87m) at Balia UP (4) Protective works at South Side of Munshipara Vangapool Road (50m) at Salondor Union, Under Sadar Upazila, District: — কাজের হিসাব | DeshLoop