কাজের হিসাব খুলছে…
কাজের হিসাব খুলছে…
Pirganj
Linked through an office; work location is not verified.
Estimate: ৳6,650,000 · Date not known
Evidence needed · Delivery date unknown
Payment and present condition remain separate questions.
(1)Improvement of CC Road At Karana Dr.Md Moksed Ali Gate Road Undar 02 No word 07 No Hajipur… · Questions, observations & replies
Loading source developments…
Each step is a separate stage; amounts are never added together.
Estimate or approved cost
৳66.5 lakhEstimate · ৳6,650,000 · Date not known · 2025-2026Procurement planning estimate; not an appropriation, award or payment.
Funds released
This record does not cover this stage
Contract
This record does not cover this stage
Spending in a report
This record does not cover this stage
Certified bill
This record does not cover this stage
Payment made
This record does not cover this stage
The list of what each part of this work costs (an estimate or BOQ) has not been obtained. It cannot be worked out from the contract total.
Planned advertisement
PlannedPlanned bid submission
PlannedPlanned bid opening
PlannedPlanned evaluation report
PlannedPlanned award approval
PlannedPlanned notification of award
PlannedPlanned signing
PlannedPlanned completion
PlannedToday
A date in a report or certificate is not an inspection.
For safety, keep faces, house numbers and phone numbers out of photos and posts.
Every figure, date and document with its source. Open a topic to check it.
Plan quantities and estimates; not measured delivery or payments.
1.0 nos · ৳6,650,000
Procurement-plan lot quantity and estimate, not measured work, a priced bill, delivered quantity or executed payment. Package and lot estimates may overlap and must not be added.
Plan sourceSeparate financial stages · never added together
Procurement planning estimate; not an appropriation, award or payment.
The required evidence has not been collected. Unknown does not mean zero.
Payment ledger incompleteCash balance unknown
Unknown payments are not zero. Differences between financial stages do not establish unspent or missing money. A comparable ledger and reconciliation are needed for a balance.
Planned advertisement Planned
Planned bid submission Planned
Planned bid opening Planned
Planned evaluation report Planned
Planned award approval Planned
Planned notification of award Planned
Planned signing Planned
Planned completion Planned
Every date above: A planned date, not proof the event occurred.
A completed date field or certificate claim does not establish independent acceptance. An actual start or completion date is only identified when the source establishes it.
A contract amount alone does not show how much work was delivered.
Independent acceptance and the present condition are not established here. A dated resident observation appears in the conversation as a citizen account.
Only this record’s scope. Related plans, contracts and programme budgets cannot be added together. Associated through the procuring office; local delivery and district share are not verified.
The purchasing office connects this record to Thakurgaon; the work location must be read from its scope.
(1)Improvement of CC Road At Karana Dr.Md Moksed Ali Gate Road Undar 02 No word 07 No Hajipur Union(2) CC Road At H/O Amin Master Gate Road Undar 03 No word 07 No Hajipur Union .(3)CC Road At H/O Mokles Road Undar 05 No word 07 No Hajipur Union .(4) CC Road At H/O Rashidul to Abdur Razzak Road Undar 07 No word 08 No Daulatpur Union .(5) CC Road At Majid Fartilizer Shop To Nazir House Road Undar 02 No word 08 No Daulatpur Union.(6) CC Road At Belsua H/O Noresh to Nipen Road Undar 07 No Word- 09 Sengaon Union.(7) CC Road At Beldahi Fatterhat to H/O Israel Road Undar 05 No Word 09 Sengaon Union .(8) CC Road At Deodha H/O Dulal to Khalil Member Road Undar 04 No Word 09 Sengaon Union .(9) CC Road At Ranshia Main Road to Pathan Para jame Mosque Road Undar 10 Jabarhat Union.(10) CC Road At Vrodhunggaon Main Road to Zilapar Jame Mosque Undar10 Jabarhat Union .(11)CC Road At Kalijuk H/O Faruk to Mizan Undar10 Jabarhat Union.(12) CC Road At Shirail H/O Tariqul to Chairman Road Undar 08 no Ward 11 Bairchuna Union .(13) CC Road At Shirail H/O Joynal to Giaspool Road Undar 08 no Ward 11 Bairchuna Union.(14) CC Road At Shirail H/O Naser to Sadequl Road Undar 06 no Ward 11 Bairchuna Union .(15) CC Road At Karnai Old Market H/O Abdur Rahman TO ABU Sufyan Road Undar 06 No Ward 10 No Jabar hat Union .(16) CC Road At H/O Hamidul To Mamun Road Undar 06 No Ward 07 No Hajipur Union .(17) CC Road At Ajlabad Paka Road To Aminul Chowdhury House Road Undar 0 No Ward 11 No Bairchuna Union (18)CC Road At Romna Chandehar H/O ABul to Anwar Road 11 No Bairchuna Union .(19)Repair work of Boirchuna High School Under 11 -no Boirchuna UP..(20) CC Road At H/O Faruk Member To Siril Paka Road Undar 0 No Ward 11 No Bairchuna Union.(21) CC Road At H/O Faruk Member To Siril Paka Road Part: 02 Undar 0 No Ward 11 No Bairchuna Union Upazila : Pirganj,Dist: Thakurgaon
Planned quantities are separate from measured or accepted work.
These are questions to check. Missing records, money differences and reported completion do not establish corruption.
The work’s current stage and document availability have not yet been reviewed. A plan or tender record does not establish that work took place or that a final bill is due. The records below still need checks for applicability and a collection route.
Office holding all of these: Office of the Upazila Engineer, Pirganj, Thakurgaon
A title and total price do not establish quantities, specifications or unit rates.
Signing, planned dates and source-reported dates have different meanings.
A progress percentage or completion claim is not itemized accepted work.
A Final Bill remark does not supply the signed bill, retention, tax or adjustments.
Reported expenditure does not identify every executed transaction or a current balance.
Original documents · open a page to check the claim
…