The source mentions the area; local delivery is not established.
Estimate: ৳20,600,000 · Date not known
Evidence needed · Delivery date unknown
Payment and present condition remain separate questions.
New Cut Size B-Twill Gunnies with 50 kg packing capacity made in the year 2026 or latest. Size:… · Questions, observations & replies
Loading source developments…
Each step is a separate stage; amounts are never added together.
Estimate or approved cost
৳2.06 croreEstimate · ৳20,600,000 · Date not known · 2025-2026Procurement planning estimate; not an appropriation, award or payment.
Funds released
This record does not cover this stage
Contract
This record does not cover this stage
Spending in a report
This record does not cover this stage
Certified bill
This record does not cover this stage
Payment made
This record does not cover this stage
The list of what each part of this work costs (an estimate or BOQ) has not been obtained. It cannot be worked out from the contract total.
Planned advertisement
PlannedPlanned bid submission
PlannedPlanned bid opening
PlannedPlanned evaluation report
PlannedPlanned award approval
PlannedPlanned notification of award
PlannedPlanned signing
PlannedPlanned completion
PlannedToday
A date in a report or certificate is not an inspection.
For safety, keep faces, house numbers and phone numbers out of photos and posts.
Every figure, date and document with its source. Open a topic to check it.
Plan quantities and estimates; not measured delivery or payments.
200000.0 NOS · ৳20,600,000
Procurement-plan lot quantity and estimate, not measured work, a priced bill, delivered quantity or executed payment. Package and lot estimates may overlap and must not be added.
Plan sourceSeparate financial stages · never added together
Procurement planning estimate; not an appropriation, award or payment.
The required evidence has not been collected. Unknown does not mean zero.
Payment ledger incompleteCash balance unknown
Unknown payments are not zero. Differences between financial stages do not establish unspent or missing money. A comparable ledger and reconciliation are needed for a balance.
Planned advertisement Planned
Planned bid submission Planned
Planned bid opening Planned
Planned evaluation report Planned
Planned award approval Planned
Planned notification of award Planned
Planned signing Planned
Planned completion Planned
Every date above: A planned date, not proof the event occurred.
A completed date field or certificate claim does not establish independent acceptance. An actual start or completion date is only identified when the source establishes it.
A contract amount alone does not show how much work was delivered.
Independent acceptance and the present condition are not established here. A dated resident observation appears in the conversation as a citizen account.
Only this record’s scope. Related plans, contracts and programme budgets cannot be added together. Wider source context; mention does not establish delivery in Thakurgaon.
The source mentions the area; it does not establish local delivery.
New Cut Size B-Twill Gunnies with 50 kg packing capacity made in the year 2026 or latest. Size: Length cm (Inch)- 94cm/37inches (Tolerance +4cm, -0); Width cm (Inch)--57cm/22.5 inches (Tolerance +4cm, -0); weight gm (Pound)- 730.00 gm/1.60 Pound (Tolerance+10%, -7.5%); Ex-Cloth: 22.5 inches-12.3 oz/36 inches 6 x 8 (WIP Weight in Proportion) Did B-twill Jute Cloth); Porter (Ends/dm): 6(76) (Tolerance +4, -3); Shots/Ins (Picks/dm): 8(31) (Tolerance +2, -1); Moisture Regain (MR%): Contract 20%, Maximum22%; Oil Content: 4%. Maximum; Sewn: Hemmed Mouth, Overhead Dry Sewn (OHDS)/Herackle Sewn (HKL); Stitch/dm: Heming 9-11, Overhead Dry Sewn (OHDS)/Herackle Sewn (HKL) 9-11; Seam Yarm Count: Hemming 9 lbs 1 Ply, Overhead Dry Sewn (OHDS)/ Herackle Sewn (HKL)10-11 lbs 3 Ply; Strength(Kg) (a) Cloth breaking load(Strip method 10x12 cm)- Warp Way-160Kg (minimum), Waft Way-165Kg (minimum), (b) Seam breaking load(Strip method 5x20 cm)- 62Kg (minimum); No. of Bag per Bundle-25 Pcs (Tolerance �???�??�?�°0); No. of Bundle per Bele-12Bundle (Tolerance 0); No. of Bag per Bale -200 Pcs (Tolerance �???�??�?�°0); Bale Weight- Net Weight=146 Kg (Tolerance+ Acceptable,-0), Tare Weight=3Kg, Gross Weight=149Kg; Bale packing- Flat Packing, Bags Wrap in Clean Jute Cloth and Banded with 2(two) Iron Belt. Thakurgaon sadar LSD -2,00,000 PCS
Planned quantities are separate from measured or accepted work.
These are questions to check. Missing records, money differences and reported completion do not establish corruption.
The work’s current stage and document availability have not yet been reviewed. A plan or tender record does not establish that work took place or that a final bill is due. The records below still need checks for applicability and a collection route.
Office holding all of these: Office of the Director Procurement
A title and total price do not establish quantities, specifications or unit rates.
Signing, planned dates and source-reported dates have different meanings.
A progress percentage or completion claim is not itemized accepted work.
A Final Bill remark does not supply the signed bill, retention, tax or adjustments.
Reported expenditure does not identify every executed transaction or a current balance.
Original documents · open a page to check the claim
…