Thakurgaon Sadar
Linked through an office; work location is not verified. Amounts from listings may be approximate.
Awarded contract: ৳163,177,531.659 · 9 November 2023
Evidence needed · Delivery date unknown
Payment and present condition remain separate questions.
Construction of 10-Storied Administrative Building with 10-Storied Foundation in/c Sanitary, Water… · Questions, observations & replies
Loading source developments…
Each step is a separate stage; amounts are never added together.
Estimate or approved cost
Record not obtainedFunds released
Record not obtained · unknown is not zero
Contract
৳16.32 croreAwarded contract · ৳163,177,531.659 · 9 November 2023Award detail where available; listing-only amounts are approximate. This is not a payment.
Spending in a report
Record not obtainedCertified bill
Record not obtained · unknown is not zero
Payment made
Record not obtained · unknown is not zero
The list of what each part of this work costs (an estimate or BOQ) has not been obtained. It cannot be worked out from the contract total.
Contract signed
Contract recordProposed contract start
PlannedProposed contract completion
PlannedToday
A date in a report or certificate is not an inspection.
The name is in the full account below. Contracts under the same personal name are not grouped.
For safety, keep faces, house numbers and phone numbers out of photos and posts.
Every figure, date and document with its source. Open a topic to check it.
Separate financial stages · never added together
Award detail where available; listing-only amounts are approximate. This is not a payment.
Payment ledger incompleteCash balance unknown
Unknown payments are not zero. Differences between financial stages do not establish unspent or missing money. A comparable ledger and reconciliation are needed for a balance.
Contract signed Contract record
A dated source report, not an independent inspection, acceptance or executed-payment record.Proposed contract start Planned
Proposed date in the award notice. It does not establish actual commencement or completion.Proposed contract completion Planned
Proposed date in the award notice. It does not establish actual commencement or completion.A completed date field or certificate claim does not establish independent acceptance. An actual start or completion date is only identified when the source establishes it.
Date not established · Official award’s work location; exact site coordinates and asset boundary remain unverified.
Independent acceptance and the present condition are not established here. A dated resident observation appears in the conversation as a citizen account.
Only this record’s scope. Related plans, contracts and programme budgets cannot be added together. Associated through the procuring office; local delivery and district share are not verified.
The purchasing office connects this record to Thakurgaon; the work location must be read from its scope.
Construction of 10-Storied Administrative Building with 10-Storied Foundation in/c Sanitary, Water Supply & Electrification Works at Dr. M.A Wazed Miah Engineering College Under Sadar Upazila, Thakurgaon District.
Planned quantities are separate from measured or accepted work.
Counts as printed in the procurement source. These counts alone do not establish misconduct.
These are questions to check. Missing records, money differences and reported completion do not establish corruption.
The work’s current stage and document availability have not yet been reviewed. A plan or tender record does not establish that work took place or that a final bill is due. The records below still need checks for applicability and a collection route.
Office holding all of these: Office of the Executive Engineer, EED, Thakurgaaon District.
A title and total price do not establish quantities, specifications or unit rates.
Signing, planned dates and source-reported dates have different meanings.
A progress percentage or completion claim is not itemized accepted work.
A Final Bill remark does not supply the signed bill, retention, tax or adjustments.
Reported expenditure does not identify every executed transaction or a current balance.
Exact identifiers and possible matches remain distinct, and a programme total is not this work’s share.
Planned purchases and quantities. A plan does not prove an award, delivery or payment.
Possible match · needs reviewplan-818800
Candidate: unique package text only
Read each connection’s basis and scope before comparing amounts.
Identifier matchedprogramme-224261500
Exact reported project code; no local allocation split
Original documents · open a page to check the claim
…