কাজের হিসাব খুলছে…

Bank protection work along the Right Bank of Senua River from Km 19.50 to Km 19.750 = 250 m, km. 10.50 to Km. 10.70 = 200 m & Left Bank of km. 8.50 to Km. 8.60 = 100 m in Upazila Thakurgaon Sadar, Dist. Thakurgaon under Thakurgaon O&M Division, BWDB, Thakurgaon in C/W Rehabilitation of Tangon Barrage, Buri Bundh & Bhully Bundh Irrigation Projects; River Bank Protection and Construction of Combined Water Control Structure in Thakurgaon District Project. (Package no. Thk-W-30) — কাজের হিসাব | DeshLoop